What’s been going on?

Moving right along in checking things off the list.  Propane tanks installed, lines in and inspected, passed.  Office building is painted and almost all the trim is up or cut, ready for paint.  Bathroom fixtures are installed.  Water pressure tank is installed and the electrical hooked up to it.  The electrical is 95% done, with Bob Rimol the greenhouse company owner to come on Tuesday to hook up the greenhouse heating/cooling system.

The heat/ac unit for the office will be installed on Monday as the rough in was not done to the specs of the unit and is backwards.

Got two reps coming on Monday for fountains, statues. Met with perennial company this week and got that order finalized. Working on seeds, tools, etc. More mulch to be delivered on Monday.

I am sure there is more and I need to get pics up here.

Oh, the green roof is done. Looks great and will probably need a bit of watering today.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s